Use these steps if the Opera Cloud files have not imported, or if you need to import files for prior days. 


The three night audit reports needed in xml format are: 


  1. Trial Balance
  2. Managers Report
  3. Market Segment Report (also called Day/MTD/YTD Statistics Report)
    1. Here are the parameters for the Day/MTD/YTD Statistics Report.

      Ensure NOT to include Unused Codes, Day Use Rooms or No-Show Rooms.

      Group by Market Group.

      Subgroup by Market Code.



To complete the Daily Activity Import, there are 2 main steps to be completed. 

 

Part 1 is downloading the XML and PDF files. 

 

Part 2 is importing the XML files into Inn-Flow (the PDFs are uploaded into the Documents tab of the Files section for reference).



 Part 1:

 

Within Opera Cloud, run the below reports and save these in .xml format (then again in PDF). Please rename each file to include the date if running more than one.

 

  1. Trial Balance (save the file as trial_balance)
  2. Managers Report (save the file as manager_report)
  3. Market Segment Report (save the file as stat_dmy_seg)


This report should be generated with all settings below:


The files will not import if the name of the file does not match above settings. 



 Part 2:

 

To manually import the Daily Activity files into Inn-Flow:

 

Log into Inn-Flow


Navigate to Accounting > Daily Activity Entry


If a hotel ID isn’t selected from the top left dropdown, select the hotel you’re importing the files for

from the EHID options.


On the right side of the page, locate the Files section of Daily Activity Entry:



 

 

To Upload the files, select browse files, or drag and drop all necessary files into the upload box. 


Note: the screenshots in this article reference the FOSSE PMS and the files required for FOSSE. Your PMS system may have a different file list. 

 

 

The files will then show as processing. 

 

 

After the files have processed, you will see a success message, showing that all files have imported. 


The data will be displayed in each section as expected, and any Codes that need to be mapped will be called out on the "Codes" tab.  


We STRONGLY suggest that you upload PDF version of the reports, or additional night audit reports, within the Documents tab of the file area.

 

Complete the Night Audit Checklist then Complete Entry to move to the following day.

 

 


Was this article helpful?

That’s Great!

Thank you for your feedback

Sorry! We couldn't be helpful

Thank you for your feedback

Let us know how can we improve this article!

Select at least one of the reasons
CAPTCHA verification is required.

Feedback sent

We appreciate your effort and will try to fix the article