Use these steps if the Visual Matrix files have not imported, or if you need to import files for prior days. 


The two night audit reports needed in EXCEL format are: 


  1. Daily Report 
  2. Market Segmentation



To complete the Visual Matrix Daily Activity Import, there are 2 main steps to be completed. 

 

Part 1 is downloading the Excel files. 

 

Part 2 is importing the Excels files into Inn-Flow 



 Part 1:

 

Within Visual Matrix, run the below reports and save these in Excel Format

 

  • Daily Report 
  • Market Segmentation




 Part 2:

 

Within Inn-Flow, go to Accounting > Daily Activity Entry.

 

Select Import.

 

A picture containing timeline

Description automatically generated

 

 Select the Upload/Import PMS button.

 

A screenshot of a cell phone

Description automatically generated

 

Select Upload on the top-right of the page.

A screenshot of a cell phone

Description automatically generated

 

Select Choose Files and select the three XML files saved from Part 1 above. 

 

Graphical user interface

Description automatically generated with medium confidence

 

 

 Select Upload. You should get three green checks on the left side.

 

 

You can expand the blue Upload Log on the right if there is an error. This will show if any reports do have an error.

 

 

 Then select the Import button on the top-right of the page to import the data:

 

 

This will remove any previously entered data and overwrite it per the reports. Select OK to continue.

 

A screenshot of a cell phone

Description automatically generated

 

 You’ll receive a pop-up when your files have been imported successfully! Select OK.

 

A screenshot of a cell phone

Description automatically generated

 

Then select Close on the top-right of the screen to proceed back to Daily Activity Entry.

 

If you receive a pop-up like below, stating that there are auto-import errors, select OK.

 

Graphical user interface, text

Description automatically generated

 

Review the link below to resolve or contact Customer Support by emailing [email protected]


 

Auto Import Errors occur when a new code has been used that has not been previously created or mapped. Once you map the new code, it will import correctly moving forward.


 

Complete the Night Audit Checklist and the Approve & Next button. 